Tradie Run Sheet Builder / Run sheet templates / Tiler
Daily run sheet template for tilers
Cutting tile and stripping old walls: the lines met most are silica when cutting, asbestos behind old wall tiles, and a tiler working alone.
Fill in the template, paste it back, and print one page for the morning: who is on which job in travel order, what to load, the client note and the before-you-start lines each job's ticks call for.
Download the jobs template CSV Crew template CSV
The columns, exactly as the builder reads them. Jobs: client, suburb, task, materials, status, crew, start, needed, trade, licences, tags.
Crew: name, role, tickets, apprentice year, last construction work. Tags and licences use the fixed keys on the rules page, separated by semicolons.
The lines tiler jobs meet most
Stone benchtops or cutting silica products tag key
silica- No engineered stone; silica cutting only with controlled processing
Clauses: the model WHS Regulations r529C, r529D-529F. More on this tag.
Pre-1990 building, refurbishment tag key
asbestos- Asbestos identified before disturbing; over 10 m2 needs a licensed removalist
Clauses: the model WHS Regulations r456-457, r485-488. More on this tag.
Working alone tag key
alone- Check-in contact and time
Clauses: the model WHS Regulations r48. More on this tag.
A filled example
Three tiler jobs and three crew, invented. Jobs example CSV, crew example CSV.
| client | suburb | task | materials | status | crew | start | needed | trade | licences | tags |
|---|---|---|---|---|---|---|---|---|---|---|
| Bathroom tiling | Balgowlah 2093 | Strip the old wall tiles and retile the bathroom | tiles; adhesive; wet saw | Old wall sheeting behind the tiles | 07:30 | 2 | building | asbestos; silica | ||
| Kitchen splashback | Freshwater 2096 | Cut and lay the porcelain splashback | tiles; wet saw; grout | Client out until 2 | Noa Reid | 1 | building | silica; alone | ||
| Balcony regrout | Manly 2095 | Rake out and regrout the balcony | grout; sealer | Unit empty, key with the manager | 1 | building | alone |
| name | role | tickets | apprentice year | last construction work |
|---|---|---|---|---|
| Noa Reid | tiler | white card | ||
| Eli Park | tiler | white card | ||
| Jo Wynn | apprentice tiler | white card | 1 |
Fill it in, paste it back
Open the run sheet builder, paste the jobs and the crew, set the date, state and depot, and print. It is free for any number of jobs.
Questions
- What goes on a daily run sheet for tilers?
- Who is on which job, the travel order, what to load, the client note, and the before-you-start lines the job calls for. For tilers the lines met most are: stone benchtops or cutting silica products; pre-1990 building, refurbishment; working alone.
- Is there a run sheet template I can download?
- Yes: the jobs template CSV carries the exact columns the builder reads (client,suburb,task,materials,status,crew,start,needed,trade,licences,tags), and the crew template carries name,role,tickets,apprentice year,last construction work. Fill them in and paste them back.
- Does the template read the task for hazards?
- No. Hazard lines print only for the tags you tick or write in the tags column.