Tradie Run Sheet Builder

Tradie Run Sheet Builder / Run sheet templates / Tiler

Daily run sheet template for tilers

Cutting tile and stripping old walls: the lines met most are silica when cutting, asbestos behind old wall tiles, and a tiler working alone.

Fill in the template, paste it back, and print one page for the morning: who is on which job in travel order, what to load, the client note and the before-you-start lines each job's ticks call for.

Download the jobs template CSV Crew template CSV

The columns, exactly as the builder reads them. Jobs: client, suburb, task, materials, status, crew, start, needed, trade, licences, tags.

Crew: name, role, tickets, apprentice year, last construction work. Tags and licences use the fixed keys on the rules page, separated by semicolons.

The lines tiler jobs meet most

A filled example

Three tiler jobs and three crew, invented. Jobs example CSV, crew example CSV.

clientsuburbtaskmaterialsstatuscrewstartneededtradelicencestags
Bathroom tilingBalgowlah 2093Strip the old wall tiles and retile the bathroomtiles; adhesive; wet sawOld wall sheeting behind the tiles07:302buildingasbestos; silica
Kitchen splashbackFreshwater 2096Cut and lay the porcelain splashbacktiles; wet saw; groutClient out until 2Noa Reid1buildingsilica; alone
Balcony regroutManly 2095Rake out and regrout the balconygrout; sealerUnit empty, key with the manager1buildingalone
nameroleticketsapprentice yearlast construction work
Noa Reidtilerwhite card
Eli Parktilerwhite card
Jo Wynnapprentice tilerwhite card1

Fill it in, paste it back

Open the run sheet builder, paste the jobs and the crew, set the date, state and depot, and print. It is free for any number of jobs.

Questions

What goes on a daily run sheet for tilers?
Who is on which job, the travel order, what to load, the client note, and the before-you-start lines the job calls for. For tilers the lines met most are: stone benchtops or cutting silica products; pre-1990 building, refurbishment; working alone.
Is there a run sheet template I can download?
Yes: the jobs template CSV carries the exact columns the builder reads (client,suburb,task,materials,status,crew,start,needed,trade,licences,tags), and the crew template carries name,role,tickets,apprentice year,last construction work. Fill them in and paste them back.
Does the template read the task for hazards?
No. Hazard lines print only for the tags you tick or write in the tags column.