Daily run sheet template for solar installers
Panels on roofs and batteries on walls: the lines met most are the fall over 2 m, the harness rescue plan, height controls and electrical isolation.
Fill in the template, paste it back, and print one page for the morning: who is on which job in travel order, what to load, the client note and the before-you-start lines each job's ticks call for.
Download the jobs template CSV Crew template CSV
The columns, exactly as the builder reads them. Jobs: client, suburb, task, materials, status, crew, start, needed, trade, licences, tags.
Crew: name, role, tickets, apprentice year, last construction work. Tags and licences use the fixed keys on the rules page, separated by semicolons.
The lines solar installer jobs meet most
Work at height tag key
height- Work from the ground or solid platform first; ladder only when ruled out; ladder inspected and secured
Clauses: the model WHS Regulations r78, r79; the model Code of Practice on falls 9, 9.1b. More on this tag.
Harness in use tag key
harness- Rescue plan agreed before going up
Clauses: the model WHS Regulations r80; AS/NZS 1891.4 2.1.6. More on this tag.
High risk construction work: Fall over 2 m tag key
hrcw- SWMS for this task on site; crew briefed before start; stop if the work leaves it
Clauses: the model WHS Regulations r299, r300, r301-303; the model Code of Practice for construction work 4.1, 4.2a, 4.2b, 4.3a, 4.3b, 4.3c. More on this tag.
Electrical work tag key
electrical- Isolate, lock and tag, test before touch; live work only under r 157 to 161 (necessary, risk assessed, SWMS, safety observer)
- Portable tools on RCD, test tags current
Clauses: the model WHS Regulations r154-156, r157-161, r164-165; AS/NZS 4836 3.1.3, 3.1.4; AS/NZS 3760 2.4.3-rcd, 2.5.2. More on this tag.
A filled example
Three solar installer jobs and three crew, invented. Jobs example CSV, crew example CSV.
| client | suburb | task | materials | status | crew | start | needed | trade | licences | tags |
|---|---|---|---|---|---|---|---|---|---|---|
| Six kilowatt system | Dee Why 2099 | Lay the rails and panels on a two-storey tile roof | rails; 16 panels; harness kit | Owner home all day | 07:00 | 3 | electrical | height; harness; hrcw; hrcw-fall | ||
| Inverter swap | Narrabeen 2101 | Replace the failed inverter and isolator | inverter; isolator | Garage side door open | 1 | electrical | electrical | |||
| Battery install | Belrose 2085 | Mount the battery and run the cables to the board | battery; cable; conduit | Dog kept inside | 10:00 | 2 | electrical | electrical |
| name | role | tickets | apprentice year | last construction work |
|---|---|---|---|---|
| Kira Walsh | licensed electrician | white card; electrical licence 2028-03-01 | ||
| Ben Tate | solar installer | white card | ||
| Ravi Singh | labourer | white card |
Fill it in, paste it back
Open the run sheet builder, paste the jobs and the crew, set the date, state and depot, and print. It is free for any number of jobs.
Questions
- What goes on a daily run sheet for solar installers?
- Who is on which job, the travel order, what to load, the client note, and the before-you-start lines the job calls for. For solar installers the lines met most are: work at height; harness in use; high risk construction work; electrical work.
- Is there a run sheet template I can download?
- Yes: the jobs template CSV carries the exact columns the builder reads (client,suburb,task,materials,status,crew,start,needed,trade,licences,tags), and the crew template carries name,role,tickets,apprentice year,last construction work. Fill them in and paste them back.
- Does the template read the task for hazards?
- No. Hazard lines print only for the tags you tick or write in the tags column.