Tradie Run Sheet Builder / Run sheet templates / Roofer
Daily run sheet template for roofers
Every job is up high: the lines met most are the fall over 2 m, height controls, the harness rescue plan, and asbestos in old roofing.
Fill in the template, paste it back, and print one page for the morning: who is on which job in travel order, what to load, the client note and the before-you-start lines each job's ticks call for.
Download the jobs template CSV Crew template CSV
The columns, exactly as the builder reads them. Jobs: client, suburb, task, materials, status, crew, start, needed, trade, licences, tags.
Crew: name, role, tickets, apprentice year, last construction work. Tags and licences use the fixed keys on the rules page, separated by semicolons.
The lines roofer jobs meet most
Work at height tag key
height- Work from the ground or solid platform first; ladder only when ruled out; ladder inspected and secured
Clauses: the model WHS Regulations r78, r79; the model Code of Practice on falls 9, 9.1b. More on this tag.
Harness in use tag key
harness- Rescue plan agreed before going up
Clauses: the model WHS Regulations r80; AS/NZS 1891.4 2.1.6. More on this tag.
High risk construction work: Fall over 2 m tag key
hrcw- SWMS for this task on site; crew briefed before start; stop if the work leaves it
Clauses: the model WHS Regulations r299, r300, r301-303; the model Code of Practice for construction work 4.1, 4.2a, 4.2b, 4.3a, 4.3b, 4.3c. More on this tag.
Pre-1990 building, refurbishment tag key
asbestos- Asbestos identified before disturbing; over 10 m2 needs a licensed removalist
Clauses: the model WHS Regulations r456-457, r485-488. More on this tag.
A filled example
Three roofer jobs and three crew, invented. Jobs example CSV, crew example CSV.
| client | suburb | task | materials | status | crew | start | needed | trade | licences | tags |
|---|---|---|---|---|---|---|---|---|---|---|
| Re-roof | Freshwater 2096 | Strip and replace the tile roof with metal sheeting | roof sheets; screws; harness kit | Scaffold booked for Monday | 06:30 | 3 | building | scaffolding SB | height; harness; hrcw; hrcw-fall | |
| Old shed roof | Balgowlah 2093 | Remove the old fibro shed roof before the new one goes on | drop sheets; bags | Built before the eighties, no register | 2 | building | asbestos | |||
| Gutter leak | Collaroy 2097 | Fix the leaking valley gutter | valley iron; sealant | Tenant home after 3 | 1 | building | height |
| name | role | tickets | apprentice year | last construction work |
|---|---|---|---|---|
| Dale Moss | roofer, supervisor | white card; scaffolding SB 2027-06-01 | ||
| Nina Fox | roofer | white card | ||
| Jed Carr | labourer | white card |
Fill it in, paste it back
Open the run sheet builder, paste the jobs and the crew, set the date, state and depot, and print. It is free for any number of jobs.
Questions
- What goes on a daily run sheet for roofers?
- Who is on which job, the travel order, what to load, the client note, and the before-you-start lines the job calls for. For roofers the lines met most are: work at height; harness in use; high risk construction work; pre-1990 building, refurbishment.
- Is there a run sheet template I can download?
- Yes: the jobs template CSV carries the exact columns the builder reads (client,suburb,task,materials,status,crew,start,needed,trade,licences,tags), and the crew template carries name,role,tickets,apprentice year,last construction work. Fill them in and paste them back.
- Does the template read the task for hazards?
- No. Hazard lines print only for the tags you tick or write in the tags column.