Tradie Run Sheet Builder / Run sheet templates / Property maintenance worker
Daily run sheet template for property maintenance workers
Many small jobs across many sites: the lines met most are height on ladders, one person on a job alone, asbestos in old linings, and a variation asked for on the day.
Fill in the template, paste it back, and print one page for the morning: who is on which job in travel order, what to load, the client note and the before-you-start lines each job's ticks call for.
Download the jobs template CSV Crew template CSV
The columns, exactly as the builder reads them. Jobs: client, suburb, task, materials, status, crew, start, needed, trade, licences, tags.
Crew: name, role, tickets, apprentice year, last construction work. Tags and licences use the fixed keys on the rules page, separated by semicolons.
The lines property maintenance worker jobs meet most
Work at height tag key
height- Work from the ground or solid platform first; ladder only when ruled out; ladder inspected and secured
Clauses: the model WHS Regulations r78, r79; the model Code of Practice on falls 9, 9.1b. More on this tag.
Working alone tag key
alone- Check-in contact and time
Clauses: the model WHS Regulations r48. More on this tag.
Pre-1990 building, refurbishment tag key
asbestos- Asbestos identified before disturbing; over 10 m2 needs a licensed removalist
Clauses: the model WHS Regulations r456-457, r485-488. More on this tag.
Variation pending tag key
variation- Written variation signed before the extra work starts
Clauses: the NSW Home Building Act s7E; the Queensland Building and Construction Commission Act sch1b-40-41. More on this tag.
A filled example
Three property maintenance worker jobs and three crew, invented. Jobs example CSV, crew example CSV.
| client | suburb | task | materials | status | crew | start | needed | trade | licences | tags |
|---|---|---|---|---|---|---|---|---|---|---|
| Strata repairs | Manly 2095 | Replace the stairwell light fittings and a broken handrail | handrail; fittings; ladder | Strata manager meets at 9 | 09:00 | 1 | building | height | ||
| Rental turnover | Dee Why 2099 | Patch walls, fix doors, replace the bathroom exhaust | filler; hinges; fan | Agent wants it done by Friday | Kai Rowe | 1 | building | alone | ||
| Bathroom repair | Cromer 2099 | Cut out the water-damaged wall lining | lining board; drop sheets | Variation pending: owner asked to add a shelf | 1 | building | asbestos; variation |
| name | role | tickets | apprentice year | last construction work |
|---|---|---|---|---|
| Kai Rowe | maintenance carpenter | white card | ||
| Lou Hart | handyperson | white card | ||
| Sam Ng | labourer | white card |
Fill it in, paste it back
Open the run sheet builder, paste the jobs and the crew, set the date, state and depot, and print. It is free for any number of jobs.
Questions
- What goes on a daily run sheet for property maintenance workers?
- Who is on which job, the travel order, what to load, the client note, and the before-you-start lines the job calls for. For property maintenance workers the lines met most are: work at height; working alone; pre-1990 building, refurbishment; variation pending.
- Is there a run sheet template I can download?
- Yes: the jobs template CSV carries the exact columns the builder reads (client,suburb,task,materials,status,crew,start,needed,trade,licences,tags), and the crew template carries name,role,tickets,apprentice year,last construction work. Fill them in and paste them back.
- Does the template read the task for hazards?
- No. Hazard lines print only for the tags you tick or write in the tags column.