Tradie Run Sheet Builder / Run sheet templates / Pool service technician
Daily run sheet template for pool service technicians
Pumps, pipe runs and solo service rounds: the lines met most are electrical isolation on pump work, underground services before digging, and a technician alone on the round.
Fill in the template, paste it back, and print one page for the morning: who is on which job in travel order, what to load, the client note and the before-you-start lines each job's ticks call for.
Download the jobs template CSV Crew template CSV
The columns, exactly as the builder reads them. Jobs: client, suburb, task, materials, status, crew, start, needed, trade, licences, tags.
Crew: name, role, tickets, apprentice year, last construction work. Tags and licences use the fixed keys on the rules page, separated by semicolons.
The lines pool service technician jobs meet most
Electrical work tag key
electrical- Isolate, lock and tag, test before touch; live work only under r 157 to 161 (necessary, risk assessed, SWMS, safety observer)
- Portable tools on RCD, test tags current
Clauses: the model WHS Regulations r154-156, r157-161, r164-165; AS/NZS 4836 3.1.3, 3.1.4; AS/NZS 3760 2.4.3-rcd, 2.5.2. More on this tag.
Working alone tag key
alone- Check-in contact and time
Clauses: the model WHS Regulations r48. More on this tag.
Digging tag key
digging- Underground services information obtained before digging
Clauses: the model WHS Regulations r304; AS/NZS 4836 6.3; the model Code of Practice for excavation work 3.6e, 3.6f, 3.6i, 3.6j, 3.6b, 3.6c. More on this tag.
A filled example
Three pool service technician jobs and three crew, invented. Jobs example CSV, crew example CSV.
| client | suburb | task | materials | status | crew | start | needed | trade | licences | tags |
|---|---|---|---|---|---|---|---|---|---|---|
| Pump replacement | Mona Vale 2103 | Replace the pool pump and reconnect the timer | pump; fittings | Gate code on the card | 1 | electrical | electrical; alone | |||
| Weekly service | Avalon Beach 2107 | Clean the pool, test the water, dose | test kit; chlorine | Owner away | Zoe Bell | 08:00 | 1 | other | alone | |
| New pool plumbing | Bayview 2104 | Trench for the pipe run from the pool to the filter shed | pipe; conduit | Pool builder on site | 2 | plumbing | digging |
| name | role | tickets | apprentice year | last construction work |
|---|---|---|---|---|
| Zoe Bell | pool technician | white card | ||
| Cal Otto | licensed electrician | white card; electrical licence 2027-10-01 | ||
| Rae Lund | licensed plumber | white card; plumbing licence 2027-12-01 |
Fill it in, paste it back
Open the run sheet builder, paste the jobs and the crew, set the date, state and depot, and print. It is free for any number of jobs.
Questions
- What goes on a daily run sheet for pool service technicians?
- Who is on which job, the travel order, what to load, the client note, and the before-you-start lines the job calls for. For pool service technicians the lines met most are: electrical work; working alone; digging.
- Is there a run sheet template I can download?
- Yes: the jobs template CSV carries the exact columns the builder reads (client,suburb,task,materials,status,crew,start,needed,trade,licences,tags), and the crew template carries name,role,tickets,apprentice year,last construction work. Fill them in and paste them back.
- Does the template read the task for hazards?
- No. Hazard lines print only for the tags you tick or write in the tags column.