Tradie Run Sheet Builder / Run sheet templates / Painter
Daily run sheet template for painters
Ladders, EWPs and old surfaces: the lines met most are height controls, asbestos before sanding old linings, and a painter working alone in an empty unit.
Fill in the template, paste it back, and print one page for the morning: who is on which job in travel order, what to load, the client note and the before-you-start lines each job's ticks call for.
Download the jobs template CSV Crew template CSV
The columns, exactly as the builder reads them. Jobs: client, suburb, task, materials, status, crew, start, needed, trade, licences, tags.
Crew: name, role, tickets, apprentice year, last construction work. Tags and licences use the fixed keys on the rules page, separated by semicolons.
The lines painter jobs meet most
Work at height tag key
height- Work from the ground or solid platform first; ladder only when ruled out; ladder inspected and secured
Clauses: the model WHS Regulations r78, r79; the model Code of Practice on falls 9, 9.1b. More on this tag.
Pre-1990 building, refurbishment tag key
asbestos- Asbestos identified before disturbing; over 10 m2 needs a licensed removalist
Clauses: the model WHS Regulations r456-457, r485-488. More on this tag.
Working alone tag key
alone- Check-in contact and time
Clauses: the model WHS Regulations r48. More on this tag.
A filled example
Three painter jobs and three crew, invented. Jobs example CSV, crew example CSV.
| client | suburb | task | materials | status | crew | start | needed | trade | licences | tags |
|---|---|---|---|---|---|---|---|---|---|---|
| Exterior repaint | Manly 2095 | Prepare and paint the two-storey weatherboard front | paint; rollers; drop sheets | Colours signed off | 07:00 | 2 | building | ewp11 WP | height | |
| Kitchen ceiling | Newport 2106 | Sand and paint the old kitchen ceiling | sander; paint | Old fibro ceiling | 1 | building | asbestos | |||
| Unit touch-ups | Dee Why 2099 | Patch and paint the hallway before the new tenant | filler; paint | Key with the agent | Mia Ruiz | 1 | building | alone |
| name | role | tickets | apprentice year | last construction work |
|---|---|---|---|---|
| Mia Ruiz | painter | white card; EWP boom 11m+ 2027-08-01 | ||
| Sol Park | painter | white card | ||
| Ivy Chen | apprentice painter | white card | 1 |
Fill it in, paste it back
Open the run sheet builder, paste the jobs and the crew, set the date, state and depot, and print. It is free for any number of jobs.
Questions
- What goes on a daily run sheet for painters?
- Who is on which job, the travel order, what to load, the client note, and the before-you-start lines the job calls for. For painters the lines met most are: work at height; pre-1990 building, refurbishment; working alone.
- Is there a run sheet template I can download?
- Yes: the jobs template CSV carries the exact columns the builder reads (client,suburb,task,materials,status,crew,start,needed,trade,licences,tags), and the crew template carries name,role,tickets,apprentice year,last construction work. Fill them in and paste them back.
- Does the template read the task for hazards?
- No. Hazard lines print only for the tags you tick or write in the tags column.