Tradie Run Sheet Builder / Run sheet templates / Plumber
Daily run sheet template for plumbers
Fill in the template, paste it back, and print one page for the morning: who is on which job in travel order, what to load, the client note and the before-you-start lines each job's ticks call for.
Download the jobs template CSV Crew template CSV
The columns, exactly as the builder reads them: client,suburb,task,materials,status,crew,start,needed,trade,licences,tags and name,role,tickets,apprentice year,last construction work. Tags and licences use the fixed keys on the rules page, separated by semicolons.
The lines plumber jobs meet most
Digging tag key
digging- Underground services information obtained before digging WHS Regs r 304; AS/NZS 4836:2023 6.3; Excavation Code of Practice 3.6
Clauses: the model WHS Regulations r304, AS/NZS 4836 6.3, the model Code of Practice for excavation work 3.6e, the model Code of Practice for excavation work 3.6f, the model Code of Practice for excavation work 3.6i, the model Code of Practice for excavation work 3.6j, the model Code of Practice for excavation work 3.6b, the model Code of Practice for excavation work 3.6c. More on this tag.
Trench 1.5 m or deeper tag key
trench15- Secure the area; support all sides by shoring, shielding or comparable means, benching or battering WHS Regs r 306; Excavation Code of Practice 5.1, 6
Clauses: the model WHS Regulations r306, the model Code of Practice for excavation work 5.1a, the model Code of Practice for excavation work 5.1b, the model Code of Practice for excavation work 5.1c, the model Code of Practice for excavation work 6, the model Code of Practice for excavation work 6.2c, the model Code of Practice for excavation work 6.3a, the model Code of Practice for excavation work 6.5a, the model Code of Practice for excavation work 6.7. More on this tag.
Work at height tag key
height- Work from the ground or solid platform first; ladder only when ruled out; ladder inspected and secured WHS Regs r 78, r 79; Falls Code of Practice 9, 9.1
Clauses: the model WHS Regulations r78, the model WHS Regulations r79, the model Code of Practice on falls 9, the model Code of Practice on falls 9.1b. More on this tag.
Pre-1990 building, refurbishment tag key
asbestos- Asbestos identified before disturbing; over 10 m2 needs a licensed removalist WHS Regs r 456 and 457; r 485 to 488
Clauses: the model WHS Regulations r456-457, the model WHS Regulations r485-488. More on this tag.
A filled example
Three plumber jobs and three crew, invented. Jobs example CSV, crew example CSV.
| client | suburb | task | materials | status | crew | start | needed | trade | licences | tags |
|---|---|---|---|---|---|---|---|---|---|---|
| Sewer line | Mona Vale 2103 | Dig out and replace the sewer line to the boundary | PVC pipe; bedding sand | Neighbour notified | 07:00 | 2 | plumbing | digging; trench15 | ||
| Gutter and downpipe | Newport 2106 | Replace the rear gutter | gutter; brackets | Dog in the yard | 1 | plumbing | height | |||
| Bathroom refit | Seaforth 2092 | Strip the old bathroom and rough in | fittings; drop sheets | Old fibro walls | 2 | plumbing | asbestos |
| name | role | tickets | apprentice year | last construction work |
|---|---|---|---|---|
| Ava Brooks | licensed plumber | white card; plumbing licence 2027-09-01 | ||
| Noah Kim | apprentice plumber | white card | 1 | |
| Eli Stone | labourer | white card |
Fill it in, paste it back
Open the run sheet builder, paste the jobs and the crew, set the date, state and depot, and print. It is free for any number of jobs.
Questions
- What goes on a daily run sheet for plumbers?
- Who is on which job, the travel order, what to load, the client note, and the before-you-start lines the job calls for. For plumbers the lines met most are: digging; trench 1.5 m or deeper; work at height; pre-1990 building, refurbishment.
- Is there a run sheet template I can download?
- Yes: the jobs template CSV carries the exact columns the builder reads (client,suburb,task,materials,status,crew,start,needed,trade,licences,tags), and the crew template carries name,role,tickets,apprentice year,last construction work. Fill them in and paste them back.
- Does the template read the task for hazards?
- No. Hazard lines print only for the tags you tick or write in the tags column.