Tradie Run Sheet Builder / Run sheet templates / Electrician
Daily run sheet template for electricians
Fill in the template, paste it back, and print one page for the morning: who is on which job in travel order, what to load, the client note and the before-you-start lines each job's ticks call for.
Download the jobs template CSV Crew template CSV
The columns, exactly as the builder reads them: client,suburb,task,materials,status,crew,start,needed,trade,licences,tags and name,role,tickets,apprentice year,last construction work. Tags and licences use the fixed keys on the rules page, separated by semicolons.
The lines electrician jobs meet most
Electrical work tag key
electrical- Isolate, lock and tag, test before touch; live work only under r 157 to 161 (necessary, risk assessed, SWMS, safety observer) WHS Regs r 154 to 156, r 157 to 161; AS/NZS 4836:2023 3.1.3, 3.1.4
- Portable tools on RCD, test tags current WHS Regs r 164 and 165; AS/NZS 3760:2022 2.4 (RCD operating time) and 2.5 (tagging)
Clauses: the model WHS Regulations r154-156, the model WHS Regulations r157-161, AS/NZS 4836 3.1.3, AS/NZS 4836 3.1.4, the model WHS Regulations r164-165, AS/NZS 3760 2.4.3-rcd, AS/NZS 3760 2.5.2. More on this tag.
Work at height tag key
height- Work from the ground or solid platform first; ladder only when ruled out; ladder inspected and secured WHS Regs r 78, r 79; Falls Code of Practice 9, 9.1
Clauses: the model WHS Regulations r78, the model WHS Regulations r79, the model Code of Practice on falls 9, the model Code of Practice on falls 9.1b. More on this tag.
High risk construction work: Near powerlines or live electrical tag key
hrcw- SWMS for this task on site; crew briefed before start; stop if the work leaves it WHS Regs r 299, r 300, r 303; Construction Code of Practice 4.1 to 4.3
Clauses: the model WHS Regulations r299, the model WHS Regulations r300, the model WHS Regulations r301-303, the model Code of Practice for construction work 4.1, the model Code of Practice for construction work 4.2a, the model Code of Practice for construction work 4.2b, the model Code of Practice for construction work 4.3a, the model Code of Practice for construction work 4.3b, the model Code of Practice for construction work 4.3c. More on this tag.
A filled example
Three electrician jobs and three crew, invented. Jobs example CSV, crew example CSV.
| client | suburb | task | materials | status | crew | start | needed | trade | licences | tags |
|---|---|---|---|---|---|---|---|---|---|---|
| Switchboard upgrade | Manly 2095 | Replace the switchboard | main switch; RCBOs | Power off 9 to 11 | 07:30 | 2 | electrical | electrical | ||
| Shop lighting | Dee Why 2099 | Six LED panels in the ceiling | LED panels; ladder | Shop opens at 10 | Sam Reyes | 1 | electrical | electrical; height | ||
| Carport feed | Collaroy 2097 | New circuit to the carport near the street mains | cable; conduit | Owner home after 3 | 2 | electrical | electrical; hrcw; hrcw-electrical |
| name | role | tickets | apprentice year | last construction work |
|---|---|---|---|---|
| Lee Grant | licensed electrician | white card; electrical licence 2027-06-30 | ||
| Sam Reyes | licensed electrician | white card; electrical licence 2026-12-01 | ||
| Tia Moss | apprentice electrician | white card | 1 |
Fill it in, paste it back
Open the run sheet builder, paste the jobs and the crew, set the date, state and depot, and print. It is free for any number of jobs.
Questions
- What goes on a daily run sheet for electricians?
- Who is on which job, the travel order, what to load, the client note, and the before-you-start lines the job calls for. For electricians the lines met most are: electrical work; work at height; high risk construction work.
- Is there a run sheet template I can download?
- Yes: the jobs template CSV carries the exact columns the builder reads (client,suburb,task,materials,status,crew,start,needed,trade,licences,tags), and the crew template carries name,role,tickets,apprentice year,last construction work. Fill them in and paste them back.
- Does the template read the task for hazards?
- No. Hazard lines print only for the tags you tick or write in the tags column.