Tradie Run Sheet Builder

Tradie Run Sheet Builder / Run sheet templates / Carpenter

Daily run sheet template for carpenters

Frames, decks and cladding: the lines met most are the fall over 2 m, height controls, silica when cutting fibre cement, and a variation before extra work.

Fill in the template, paste it back, and print one page for the morning: who is on which job in travel order, what to load, the client note and the before-you-start lines each job's ticks call for.

Download the jobs template CSV Crew template CSV

The columns, exactly as the builder reads them. Jobs: client, suburb, task, materials, status, crew, start, needed, trade, licences, tags.

Crew: name, role, tickets, apprentice year, last construction work. Tags and licences use the fixed keys on the rules page, separated by semicolons.

The lines carpenter jobs meet most

A filled example

Three carpenter jobs and three crew, invented. Jobs example CSV, crew example CSV.

clientsuburbtaskmaterialsstatuscrewstartneededtradelicencestags
Deck rebuildSeaforth 2092Frame the new deck 2.5 m above the gardenjoists; bearers; boltsClient home07:002buildingheight; hrcw; hrcw-fall
CladdingNewport 2106Cut and fix fibre cement cladding to the extensioncladding; saw; dust extractorNeighbour asked for quiet after 32buildingsilica
Door and frameMosman 2088Hang the new front door and framedoor; frame; hardwareVariation pending: owner wants a wider door1buildingvariation
nameroleticketsapprentice yearlast construction work
Will Halecarpenter, supervisorwhite card
Tess Moycarpenterwhite card
Arlo Kimapprentice carpenterwhite card1

Fill it in, paste it back

Open the run sheet builder, paste the jobs and the crew, set the date, state and depot, and print. It is free for any number of jobs.

Questions

What goes on a daily run sheet for carpenters?
Who is on which job, the travel order, what to load, the client note, and the before-you-start lines the job calls for. For carpenters the lines met most are: work at height; high risk construction work; stone benchtops or cutting silica products; variation pending.
Is there a run sheet template I can download?
Yes: the jobs template CSV carries the exact columns the builder reads (client,suburb,task,materials,status,crew,start,needed,trade,licences,tags), and the crew template carries name,role,tickets,apprentice year,last construction work. Fill them in and paste them back.
Does the template read the task for hazards?
No. Hazard lines print only for the tags you tick or write in the tags column.